Commit Graph
3 Commits
Author SHA1 Message Date
octoturge 9359add6aa Drive Klipper, OctoPrint and PrusaLink for real
Windows discovery tool / windows (push) Successful in 1m2s
The three were println stubs. Each is now an HTTP client (Moonraker,
OctoPrint's REST API, PrusaLink's v1 API) behind a small shared helper:
status polled in the background, pause/resume/cancel, G-code lines, fan
speed, and upload-and-start of a sliced file. A slicer project (.3mf) is
refused for these, and so is an upload while a print is running.

Telemetry and the completion watcher now read a vendor-neutral
PrinterStatus instead of Bambu's PrintReport, so these printers report
progress, temperatures and job state to the cloud.

Written from the public API docs and tested against mock servers only; no
real Klipper, OctoPrint or PrusaLink machine has been on the bench.
2026-10-30 07:49:31 +00:00
octoturge 7d4cf41999 Confirm the light and the upload on a real P1P
Four things were shipped unverified because the printer was off when they
were written. Three are now confirmed first-hand (P1P, 2026-10-15), and one
is settled in the opposite direction from what was assumed.

**`set_light` had never once reached a printer**, and `completion::run`
blinks a finished print's chamber light with it. It works - but "accepted" is
not "it changed": `ledctrl` answers `result: "success"` as soon as the
command parses, exactly like the print-control verbs. So `lights_report` is
now modelled on `PrintReport`, which is the only read-back there is, and the
probe polls it rather than printing a reassuring message. Setting the light
on and off reads `[{"node":"chamber_light","mode":"on"}]` / `"off"` back,
about 3s later. The field was observed on v1 even though only the v2 schema
declares it.

**The blink itself works at the rate it ships at.** `completion::celebrate`
is now public so the probe runs the real function instead of a copy: twenty
`ledctrl` commands half a second apart, which a printer is entitled to
refuse. None were refused, it returned after 10.35s, and the light ended
`off` as specified - a blink that leaves the light on would look like a
printer still working.

**The firmware's own `flashing` mode is not the better option.** It is
accepted, and the reply echoes all four parameters back
(`led_on_time`, `led_off_time`, `loop_times`, `interval_time`), so the
printer does parse them. But `lights_report` never reports `flashing` - it
stayed on the previous mode for 12s of polling. A firmware blink is therefore
unobservable: nothing can confirm it happened or tell when it ended, while
the self-driven blink is built from a call that reads back. That is a better
reason to keep `celebrate` than the one in the comment it replaces, which was
that `loop_times` semantics were unconfirmed. Whether the light physically
blinks is still unwitnessed - nobody was watching the machine.

**Multi-MB FTPS upload works, and is slow.** A 4.96 MB project archive went
up with an exact byte count and came back byte-identical (sha256). But it
took 31.3s - about 0.2 MiB/s - so the 62 MB project already on that card
would take six and a half minutes. Anything that uploads a job needs a
timeout budgeted in minutes, not seconds. The claim in `download`'s comment
that these files are "a few hundred KB" is gone; the card disproves it.

Also adds `delete`, because the probe left a 5 MB file on a real SD card and
there was no way to remove it. One explicit path, no globbing: the convenient
version of this deletes something somebody printed from last week. Used to
clean up, and the card is back as it was.

New probe steps: `light on|off|flash`, `blink`, `upload <local> [name]`,
`delete <path>`. 51 tests still pass.
2026-10-15 22:23:41 +00:00
octoturge c22ccf5d22 Derive the AMS mapping from the project, and blink on completion
Two changes, both following from the print that paused at 1% because
`use_ams: false` pointed an AMS-sliced project at the external spool.

## upload_project_file no longer guesses

It now reads the `.3mf` it already holds and works out where each filament
should come from. `Metadata/slice_info.config` names every filament's
`tray_info_idx`, type and colour; the AMS report names the same three per
loaded tray; matching them is the whole job. `src/printer/project_file.rs`
does the reading and matching and is free of printer types, so it is
testable without a printer - which is the only way this gets tested at all,
the alternative being to notice a mapping bug by watching a machine print in
the wrong colour.

The mapping is derived *before* the upload: a project that cannot be matched
should not result in a file being moved onto the machine that cannot then be
printed.

It never falls back to the external spool to make an unmatched project
"work". The one case it answers `ExternalSpool` for is a printer reporting no
AMS trays at all. A printer *with* an AMS whose project wants the spool is an
error, not a fallback, because `vt_tray` is not modelled on `PrintReport` -
there is no way to check the spool holds the right material, and claiming a
match without checking is how this went wrong the first time.

Two fixtures carry the real cases: `cube_slice_info.3mf` is the project that
cost the print (deflated on purpose - every other test archive is Stored, so
the decompression path and the flate2 backend behind zip's `deflate-flate2`
would otherwise never run), and the existing `push_status_v1_p1p_idle.json`
supplies the AMS side. The end-to-end test asserts they agree on
`[3,-1,-1,-1,-1]`: both slots hold PETG GFG99 and only the colour tells them
apart, so a matcher stopping at `tray_info_idx` would print the cube in
black.

A malformed `<filament>` element is an error rather than a skip. A skipped
filament leaves a hole at its index, the hole becomes `-1`, and the printer
is told that material is unused - so the plate prints in whatever remains
mapped.

New dependency: `zip` 9.0.3 (MIT) with `deflate-flate2`, plus `flate2` for a
backend, which zip's feature does not select on its own. All six new crates
are MIT, MIT/Apache-2.0, 0BSD/MIT/Apache-2.0, MIT/Zlib/Apache-2.0 or Zlib,
and `cargo deny check licenses` passes. No bzip2, lzma, xz or zstd entered
the graph.

## Lights on completion

`completion::run` is a third daemon task that notices a print finishing and
blinks that printer's chamber light for ten seconds, then leaves it off:
500ms on, 500ms off, twenty commands, ending dark.

Its own task rather than a branch in the uplink's telemetry loop, because
that loop only ticks while the cloud connection is up - and a light that only
works when the internet does is not much of a notification for someone
standing next to the printer.

Three rules, each a false celebration avoided and each tested: only a
*transition* into `FINISH` fires, because `FINISH` persists until the next
print starts; a printer seen for the first time never fires, so restarting
the gateway does not announce prints that finished yesterday; and `FAILED`
never fires, because that is what a Bambu reports for a cancellation,
including every `print.stop` this software sends.

The blink is driven from `On`/`Off` rather than the firmware's `flashing`
mode. `flashing` is in the schema but the meaning of `loop_times` versus
`interval_time` is unconfirmed, so "blink for ten seconds" could not be
predicted; two obvious commands give an exact duration. The light is left off
even when a blink fails part-way, since a machine abandoned with its light on
looks like one still working.

`set_light` is **unverified against hardware** - the P1P was powered off when
this was written, and the doc comment says so. The shape is built from
`schemas/bambulab/{v1,v2}/request/system/ledctrl.schema.json` rather than by
hand, and it goes out as a correlated request so a rejection is visible.
2026-10-15 21:27:24 +00:00